Inauguration and Official Opening of the J.W. McConnell Building.
Maquette authored by Lemoyne lapointe Magne, architectes et urbanistes, depicts what Concordia's proposed natural sciences building at Loyola could look like.
Maquette authored by Lemoyne lapointe Magne, architectes et urbanistes, depicts what Concordia's proposed engineering, computer Science and Fine Arts building could look like.
Angela Gupta, Samantha Blais, Ajay Gupta and Yogesh Wadera
New alumnus James Ferdinand Jr. BComm accounting, sporting a Class of '95 scarf is surrounded by his supporters: friend Linda Stroude, his father James Sr. (BA poli.sci. 93), his mother Enid and his brother Mark.
Very Rev. Patrick G. Malone, S.J. signing Campus Centre contract with Students Association's presidents. From left to right, Fr. Malone, Peter Fedele, President of Loyola Students Association, and Evening Students Association President, Jim Conway. An unidentified person is seen in the background.
Martin Hallett, president of the Faculty Club at Loyola College. The Faculty was housed at Hingston Hall.
Loyola College Contingent COTC
23 standing people on 4 rows on the stairs of the Administration Building at Loyola Campus.
Groundbreaking ceremony of the Loyola Campus Centre. From left to right, LMSA President Gordon Clark, Loyola Alumni Assocation President Brian Gallery, Father Patrick G. Malone, S.J., and an unidentified person.
Announcement on the Hall Building construction site. From left to right, an unidentified person, Mona Osborne, Dr. John O'Brien, an unidentified person and J.-P. Petolas.
Announcement on the Hall Building construction site. A worker is using a crane.
From left to right: Principal Kenneth .E. Norris, Mayor Jean Drapeau and J.B. Walls (President of the Corporation of Sir George Williams College). The building was named Kenneth E. Norris Building on November 29, 1964.
Cloister which joins the Refectory Building to the Psychology Building (formerly the High School Building) at Loyola College.
Construction of the Hall Building.
Site for the construction of the Hall Building.
Construction of the Hall Building.
Construction of the Hall Building.
Announcement on the Hall Building construction site.
Announcement on the Hall Building construction site.
Announcement on the Hall Building construction site to mark the start of demolition of buildings occupying the future university site at Burnside [later de Maisonneuve Blvd.] and Bishop St.. Principal and Vice-Chancellor Robert C. Rae and Gloria Stieger, President of the Students' Undergraduate Society.
Excavation for the Hall building.
Excavation for the Hall Building.
Hall Building Façade design. Watercolour by James A.M.K. O’Beirne.